Expansion Photo Gallery

Demolition begins in the adjacent space.

Our cleaned slate.

Chunks of the concrete floor are cut and removed. Our very own Stonehenge!

Trenches are dug to make room for plumbing and electrical lines.

All dug.

Pipes are installed in trenches.

Our new grease trap finds a home behind the store.

All covered up.

Grocery aisles are rolled together. 1/17/08

Bulk herbs are moved next to bulk coffee. 1/17/08

Registers are repositioned. 1/19/08

Things become really funny at 3 a.m. 1/19/08

Temporary wall is built to allow for construction of new restrooms. 1/20/08

The connecting wall between both spaces begins to come down. 1/21/08

If our construction sign is this nice, just imagine what the new store will look like.

Exterior partition installed along front of store. 1/23/08

What's behind the barricade. 1/25/08

Plumbing for new customer restrooms is installed. 1/25/08

Interior framing for phase one.

Exterior wall is rebuit with new entrance doors.

Interior supports are added for the exterior sign.

Supports for the exterior sign penetrate the facade.

Automatic entry doors installation is in progress. 2-22-08

Floor tile installation for coolers is underway. 2-26-08

Plumbing for restrooms is roughed-in. 2-27-08

Stock doors are installed. 3-3-08

Front window frames are installed. 3-3-08

Blocking for restroom fixtures is installed. 3-5-08

Duct is partially installed. 3/18/08

Drywall is prepared for paint. 3/18/08