Phase Two Expansion Photo Gallery

The deli is demolished in a matter of hours.

Bye-bye deli counter.

Entrance to old stock room is closed.

Old heating and air conditioning equipment is removed from ceiling.

Concrete is cut and removed to make room for plumbing and electrical work.

Underground work is complete and trenches are filled with concrete.

Wiring above ceiling tiles is demolished.

Framing is complete.

Wood blocking is installed for wall-mounted shelving.

Concrete topper is poured.

Crane removes old rack from roof to make room for the new.

How many ladders does it take?

Exposed ceiling is painted.

Sheetrock installation is underway.

Old stock room doors are replaced with kitchen door.

Stainless steel hood for kitchen.

The new dish-washing station.

Kitchen is ready for equipment.

Freezers coming soon.

Floor is cleaned and sealed.

Freezer doors are installed.

Welcome to the scullery.

Dirty dish central.

Custom designed chef's table.

New range is in place.

Meat prep.